Need a quote? Call Mark: 07824 996897
NICEIC Domestic Installer

Workplace EV Charger Installation in Worcester

EV charge points for staff, visitors and fleets, installed by a qualified EV charger installer in Worcester. Mark holds the City & Guilds 2919 Level 3 EV charger installation qualification and fits charge points for small businesses and workplaces.

NICEIC Domestic Installer
Worcestershire County Council Trading Standards Approved - Buy With Confidence
NICEIC Domestic Installer D613038BS 7671 & Part P Compliant
★★★★★5.0 Star Rated on Google1 Year Workmanship Guarantee
NICEIC Domestic Installer
Registration D613038
Trading Standards Approved
Worcestershire County Council
1 year guarantee
On all workmanship
Clear fixed prices
Quoted up front, plus VAT
Based in Worcester
Newtown Road, WR5

Charge Points for Staff and Visitors

Workplace charging is a growing expectation for staff and visitors with electric cars. Mark fits charge points with the right supply and protection, mounted neatly and tested before they go live.

Each point is certified, and the work is carried out to BS 7671 and Part P of the Building Regulations.

Load Management for Multiple Chargers

Fitting several chargers can overload a supply if they all draw full power at once. Load management shares the available capacity between the chargers so the supply is not exceeded.

Mark advises on the right approach for your premises in Worcester and quotes for the full installation up front.

Chargers for Fleets, Landlords and Car Parks

For fleets, landlords and car parks, Mark plans the number and position of the chargers and the supply needed. He works with three phase and single phase supplies as the site requires.

All workmanship carries a 1 year guarantee, and notifiable work is registered through NICEIC.

WHAT IS INCLUDED

What is included

  • ✓A site survey to check your supply, distribution board and the best positions for the chargers.
  • ✓Installation of your chosen charge points with the right protection.
  • ✓Load management where multiple chargers are fitted.
  • ✓Connection to your distribution board, with an upgrade quoted separately if needed.
  • ✓Full testing and certification of the new circuits.
PRICING

What affects the price

Number of chargers

More chargers means more units, cable and labour.

Supply capacity

If the supply or distribution board needs upgrading, that is quoted separately.

Three phase or single phase

Larger installations may need a three phase supply, which affects the scope of the work.

Load management

Adding load management for multiple chargers is included in the quote where needed.

Cable runs

Longer runs from the distribution board to the chargers add cable and labour.

HOW IT WORKS

Three simple steps

No call centre and no pushy sales. You deal with Mark from the first call to the certificate.

1

Get in touch

Call Mark or send the form with the site and the number of chargers you have in mind.

2

Survey and fixed quote

Mark checks your supply and distribution board, and gives you a fixed price plus VAT.

3

Install and certify

Mark and the team fit and test the chargers, and you receive the certificates for the new circuits.

All workmanship is guaranteed for 1 year, and we leave the job clean and tidy.

QUESTIONS

Common questions

GET A QUOTE

Tell us about the site

Send your details and Mark will call you back to talk through the chargers and arrange a survey.

Rather talk it through? Call Mark on 07824 996897 or email worcesterelectricalsolutions@gmail.com

Need workplace EV charging in Worcester?

Call Mark or send the form for a free, no-obligation quote.

Call